Demo template by Navifex Pro — Get this website for your business → · All templates
Estimate your renovation
Home / Packages

Packages

Pick the plan that fits. Everything is written down before we start.

Packages

Standard Build

Rs 6,800
per sq ft
  • Approved drawings and site supervision
  • Grade 60 steel, local tiles
  • Standard sanitary and electrical fittings
  • Wooden doors, aluminium windows
  • 1-year structural warranty
Choose Standard Build
Most chosen

Premium Build

Rs 8,200
per sq ft
  • Everything in Standard
  • Imported porcelain tiles
  • Modular kitchen and wardrobes
  • False ceiling with lighting
  • UPVC windows
  • 3-year warranty
Choose Premium Build

Luxury Build

Rs 11,500
per sq ft
  • Everything in Premium
  • Full interior design and renders
  • Solid wood doors and panelling
  • Smart switches and central AC piping
  • Dedicated project architect
  • 5-year warranty
Choose Luxury Build

Compare side by side

What you getStandard BuildPremium BuildLuxury Build
Approved drawings and site supervision✓——
Grade 60 steel, local tiles✓——
Standard sanitary and electrical fittings✓——
Wooden doors, aluminium windows✓——
1-year structural warranty✓——
Everything in Standard—✓—
Imported porcelain tiles—✓—
Modular kitchen and wardrobes—✓—
False ceiling with lighting—✓—
UPVC windows—✓—
3-year warranty—✓—
Everything in Premium——✓
Full interior design and renders——✓
Solid wood doors and panelling——✓
Smart switches and central AC piping——✓
Dedicated project architect——✓
5-year warranty——✓
PriceRs 6,800Rs 8,200Rs 11,500
FAQ

Questions people ask us

What does the per square foot rate include?

Labour, material, supervision and site cleaning as listed in the BOQ. Society fees, electricity connection and furniture are not included unless written.

How long does a 5 marla house take?

Grey structure takes around 4 to 5 months and complete construction 9 to 11 months, depending on approvals and weather.

Do you handle LDA or society approvals?

Yes, we prepare the drawings and submit the file. Approval time depends on the authority, usually 3 to 6 weeks.

How do payments work?

Payments are linked to stages: foundation, plinth, each slab, finishing. You pay after the stage is done and you have checked it.

Can I supply my own material?

You can. We will adjust the rate and our engineer will check the material before use, so we can still give a warranty.

Do you work for overseas Pakistanis?

Many of our clients live abroad. You get weekly photo and video updates and a monthly cost statement on WhatsApp and email.

Is the site visit free?

Yes, within Lahore. Our engineer measures, discusses your needs and you get a written estimate within three working days.

What if the price of steel or cement goes up mid-project?

Fixed-rate contracts stay fixed. On open-rate contracts we share the market invoice and adjust only that item.

Three build packages, one honest per-foot price for each