Design Store

Shop kitchens, panels and finishes with delivery across Pakistan

Ready-size kitchen shutters, fluted panels, tiles and wardrobes. Pay cash on delivery or by bank transfer.

Confirmed within 24 hours
Checked before dispatch
Replies 7 days a week
Order or ask on WhatsApp

Best sellers

Popular right now.

Shop all

Confirmed on a call. Pay by bank transfer or wallet.

Fittings and finishes, delivered

See everything

New in

Just added.

See all

Reviews

In their words.

Our 10 marla was finished in 13 months, which is one month later than promised, but every rupee was on the BOQ. No surprise bills at the end.
Asad MehmoodHomeowner, Bahria Town
They redid our clinic interior over two weekends so we did not lose patient days. The reception looks completely different now.
Dr. Saima QureshiClinic owner, Johar Town
I live in Riyadh and they sent me site photos every Friday. When I visited, the house matched the renders.
Imran JavedOverseas client, DHA Phase 6
The kitchen guys were tidy and actually covered the floor. Soft-close drawers still work perfectly a year later.
Farah NazHomeowner, Model Town
Got my grey structure quote in two days with a full material list. Other contractors just gave a per-foot number and nothing else.
Sheikh NaveedPlot owner, Allama Iqbal Town
Small flat, small budget, but the designer still gave it proper attention. The wardrobe storage solved half my problems.
Rabia AnwarApartment owner, Gulberg III

Sample reviews written for this demo website.

FAQ

Questions, answered.

What does the per square foot rate include?

Labour, material, supervision and site cleaning as listed in the BOQ. Society fees, electricity connection and furniture are not included unless written.

How long does a 5 marla house take?

Grey structure takes around 4 to 5 months and complete construction 9 to 11 months, depending on approvals and weather.

Do you handle LDA or society approvals?

Yes, we prepare the drawings and submit the file. Approval time depends on the authority, usually 3 to 6 weeks.

How do payments work?

Payments are linked to stages: foundation, plinth, each slab, finishing. You pay after the stage is done and you have checked it.

Can I supply my own material?

You can. We will adjust the rate and our engineer will check the material before use, so we can still give a warranty.

Do you work for overseas Pakistanis?

Many of our clients live abroad. You get weekly photo and video updates and a monthly cost statement on WhatsApp and email.

Navifex sampleWant this website? WhatsAppMore samples